Opening a restaurant means a health inspection, a building inspection, a liquor license and, somewhere in the last two weeks before the doors open, a fire inspection that a surprising number of owners have not planned for. The fire protection side of a kitchen is not complicated, but it has five separate pieces, three of them have their own code, and all of them have to be in place and documented before the fire department signs off. Here is the checklist we walk new owners through in Wisconsin and Iowa, in the order it should happen.
1. The Hood Suppression System — Before the Line Is Set
Every appliance that produces grease-laden vapor — fryers, ranges, griddles, charbroilers, woks — must be under a hood, and the hood and appliances must be protected by an automatic fire-extinguishing system. NFPA 96 requires it, NFPA 17A governs how wet chemical systems are installed and maintained, and the system must be listed to UL 300, the fire test written for modern high-efficiency fryers and vegetable oils. Iowa’s fire code rules adopt the International Fire Code, whose commercial cooking provisions say the same thing; Wisconsin’s Fire Prevention Code adopts NFPA 1, which points to NFPA 96.
The reason this is item one is that a wet chemical system is engineered nozzle by nozzle for the specific appliances under the hood, in the specific positions they will occupy. If you buy a building with an existing system and then rearrange the line — swap a range for a charbroiler, add a second fryer, move the griddle to the end — the nozzles are now pointing at the wrong things, and the system fails inspection even with a fresh tag. Settle the appliance lineup first, then have the suppression system designed or re-engineered to it. A new system needs a permit and an acceptance test with the fire department in most jurisdictions; an existing one needs a full service, new fusible links, a check of every nozzle against the appliances, and confirmation that the gas or electric shutoff and the manual pull station work. The manual pull has to be in the path of egress so a cook can trip it on the way out.
2. The Hood, Duct and Fan — Clean Before Opening
A used building’s exhaust system is the most overlooked fire hazard in a restaurant opening. The previous tenant’s grease is still in the duct, and the fan on the roof has not been looked at since whenever. NFPA 96 requires the exhaust system to be inspected for grease buildup on a schedule set by the cooking volume — quarterly for high-volume operations like charbroiling and wok cooking, semiannually for most restaurants, monthly for solid-fuel cooking — and cleaned to bare metal when deposits are found. The IFC, as adopted in Iowa, requires the cleaning records to be kept on the premises for the fire code official. Start with a clean system and a dated label on the hood, so the first inspection sees a fresh baseline and the calendar starts from opening day. Our hood cleaning visit also confirms the fan is hinged with a hold-open retainer, the duct has access panels where NFPA 96 requires them, and the grease filters are listed baffle filters rather than mesh — three things that come up on inspections constantly and are far cheaper to fix before the doors open.
3. Extinguishers — The Right Ones, in the Right Places
NFPA 10 requires a Class K wet chemical extinguisher within 30 feet of the cooking appliances, with a placard stating that the fire suppression system is to be activated before the extinguisher is used. That placard is not optional, and it exists because a dry chemical extinguisher on a fryer fire splashes burning oil and does not stop it from reigniting. The rest of the building needs Class A coverage — an ABC unit within 75 feet of any point in the dining room, offices and storage — and any area with flammable liquids, such as a cleaning closet or a bar with high-proof spirits stored in quantity, needs a Class B unit within 30 or 50 feet depending on its rating. Extinguishers are mounted with the top no more than five feet off the floor for units under 40 pounds, the bottom at least four inches up, visible, unobstructed and tagged. OSHA 1910.157 then requires monthly visual checks and an annual maintenance record. A new restaurant in Milwaukee or Cedar Rapids typically needs four to eight units, and our extinguisher inspection visit places, mounts and tags them in one trip.
4. CO₂ — The Item Nobody Puts on the List
If the restaurant has a bar or a fountain system, it has carbon dioxide, and CO₂ has its own rules. The cylinders are DOT-specification pressure vessels that must be within their five-year requalification date to be filled; the gas is heavier than air and can displace the oxygen in a basement or walk-in without warning; and the International Fire Code has a section specifically for beverage-dispensing CO₂ systems that requires gas detection and signage where more than 100 pounds is stored or used. A bulk tank in a basement keg room almost always crosses that line. Get the cylinders’ dates read, get them secured upright, and if you are installing a bulk system, plan the detector at the same time. Our CO₂ service covers the cylinders and the questions.
5. Training — Before the First Shift, Not After
OSHA requires extinguisher education for employees upon initial employment and annually, and hands-on training for anyone designated to use the equipment. In a kitchen, the practical content is short and specific: the suppression system is tripped before the Class K extinguisher is used; dry chemical is the wrong tool on a fryer; the pull station is here; the gas shutoff is here; if the fire is bigger than a pan, everyone leaves. The best time to teach it is the week before opening, when the whole crew is in the building for setup and nobody is behind on tickets. Our on-site training brings a live-fire prop to the parking lot and leaves a roster for your records, and we schedule it on the same day as the extinguisher and kitchen system work so there is one visit.
What the Fire Inspector Will Ask For
The pre-opening fire inspection in a Wisconsin city — and the recurring inspections that follow, which Wis. Stat. § 101.14(2) sets at least every six months unless the department has adopted an alternative schedule — will look for the suppression system tag, the hood cleaning label and report, the Class K extinguisher and placard, tagged extinguishers within travel distance, a clear and marked path to the exits, and the pull station. In Iowa, where the fire code rules adopt the 2024 IFC, the inspector will additionally expect the hood cleaning records on the premises and will check that the suppression system is UL 300 listed. In both states, a folder with the kitchen system report, the hood cleaning report, the extinguisher report and the training roster answers most questions before they are asked. We leave every one of those documents behind, and we send a reminder before the next service is due so the folder never goes stale.
Food Trucks and Mobile Kitchens
Wisconsin owners opening a food truck or trailer sometimes assume the fire code does not reach them. It does. SPS 314 specifically includes the NFPA 1 design requirements for an exhaust hood and an automatic fire suppression system for mobile kitchens, and a trailer with a fryer under a hood needs a listed wet chemical system serviced on the same six-month schedule as a restaurant, a Class K extinguisher, and the same extinguisher coverage for the rest of the unit. Iowa’s fire code rules adopt the IFC’s mobile food preparation vehicle provisions, which require the same protection and add rules for the propane system. A truck operating at events in Madison or along the river in Davenport will be asked for its tag by the event’s fire inspector, and a truck that does not have one does not serve.
Getting It All on One Calendar
Five pieces, three codes, two inspectors and an insurance carrier is a lot for an owner who is also hiring a kitchen and negotiating a lease. The way to make it manageable is one company, one calendar and one folder. The suppression system and the hood are on six-month intervals; the extinguishers, the training and most of the CO₂ questions are annual; and all of them come from one company — hood cleaning on its own appointment with our cleaning crew, the rest usually on one visit. We have been doing that for restaurants across Dubuque, La Crosse and the rest of our service area since 1975, and the owners who call us during buildout instead of the week the inspector is due are the ones who open on time.
Questions We Get Asked
The previous restaurant’s suppression system is still installed. Can I use it?
Only after it has been serviced and its nozzle layout checked against your appliances. If your line is different from theirs — and it usually is — the system needs to be re-engineered. If it is an older dry chemical system that was never listed to UL 300, it needs to be replaced.
Do I need a Class K extinguisher if I have a hood system?
Yes. NFPA 10 requires a Class K unit within 30 feet of the cooking appliances in addition to the suppression system, with a placard telling staff to activate the system first.
How soon before opening should I schedule the fire protection work?
Once the appliance lineup is final and the hood is installed, and at least two weeks before the fire inspection. A new suppression system needs a permit and an acceptance test; a hood cleaning and extinguisher placement can be done in a day.
Does a food truck really need a suppression system in Wisconsin?
If it has cooking equipment that produces grease-laden vapor under a hood, yes. SPS 314 applies the NFPA 1 hood and suppression design requirements to mobile kitchens, and the system is serviced every six months like a restaurant’s.
What records should I have in the building on opening day?
The kitchen suppression system report and tag, the hood cleaning report and the label on the hood, the extinguisher inspection report, the training roster, and, if you have a bulk CO₂ system, the installation and detector documentation. One folder near the office door.
Tell us what you have and where you are.
Extinguishers, a kitchen system, a hood, a booth — one visit, one invoice. We reply the same business day.
5675 Southwest Rd, Platteville, WI 53818 · Mon–Thu 8:00–4:30, Fri 8:00–2:00
